Share your substrate condition, application and timeline — our engineering team typically responds with a system recommendation and quotation within 2 business days.
Huidong Industrial Zone, Hui'an County, Quanzhou, Fujian Province, China (Nanwang Technology HQ Building)
+86 595 8717 7777
qijiaoshou77@126.com
Standard proposals within 2 business days of receiving site details
This form opens your email client with the details pre-filled, addressed to our team.
We operate as a turnkey provider: R&D, manufacturing, sales, installation and after-sales are all handled in-house. This is deliberate — material performance alone cannot guarantee a good floor without disciplined, certified installation.
It depends on project size and substrate condition. As a reference, projects up to roughly 5,000 m² typically take 1–3 weeks; larger or more complex substrates (high moisture, poor flatness, cross-trade scheduling) extend the timeline. We confirm exact timing in the formal proposal.
Walkable the next day, light loads after 3 days, heavy loads after 7 days, with full cure and peak performance reached around 20 days.
Yes. We assess every substrate before proposing a system. Photos and a completed site survey form let us prepare an initial proposal remotely; a physical site visit can follow for larger or more complex projects.
We welcome international inquiries for both material supply and technical consultation. Share your project location and requirements and our team will advise on the best path — material export, technical licensing, or a partnered local installation.